Sample content. This article is placeholder text supplied by the site build and has not been approved by SHEDA.

Integrated Manufacturing at the Cikande Facility

From raw material preparation through to packaging, nine manufacturing processes are being brought together on one site in Serang, Banten.

SHEDA is progressively integrating the major processes required for professional hand tool production at its facility in Serang, Banten.

Bringing forging, heat treatment, machining, surface treatment and assembly onto one site gives closer control over quality, cost and lead time.

Chat on WhatsApp